Hotline:+86-0510-88782802 中文 | English

Mast Climbing WorkThe current position:Home > Products > Mast Climbing Work >

Mast climbing work platform

SCP type construction platform works with the same driving principle with the building hoist.So its main parts can be interchanged with building hoist such as mast sections,rack,pinion,reducing device and so on.And its width and length can be changed according to requirement also.So it is requisite equipment in construction job.Additionally,it is no need for foundation so that it is easy to change the working site.
SCP construction platform can replace steel,bamboo or wooden scaffold,which is especially suitable for glass wall installation and wall decoration, as well as other work high above the ground such as cleaning glasses,white washing walls,hoisting ceilings and installing wire ways etc.
               Type
  Data
SCP230/9D
SCP200/12D
SCP400/30S
  Max.length(m)
9
12
30
  Rated lifting speed(m/min)
8
6
6
  Basic width(m)
1.5
1.5
1.5
  Max.width(m)
2.7
2.7
2.7
  Motor power(KW)
2×3
2×3
2×2×3
  Max.unattached height(m)
12
3
3
  Max.erection height(m)
150
150
150
  Interval distance of tie-in(m)
3~7.5
3~9
3~9
  Weight of main unit(kg)
600
1000
1000
  Ⅰtype platform section length(m)
1.5
1.22
1.22
  Ⅱtype platform section length(m)
0.85
/
/
  Size of mast section(L×W×H)(mm)
500×500×1508
650×650×1508
650×650×1508
  Type of safety device
SAJ30-1.2
SAJ30-1.2
SAJ30-1.2
  Type of overload protector
HC-A
HC-A
HC-A

Pre:None Next:None